
APRIL 2010. The oil and gas equipment, i.e. several aftercoolers were successfully delivered from St.Petersburg to Almetyevsk (Tatarstan). The lot of equipment included 2 oversized cargo pieces with the width of 4.1 m and with the height of 3.7 m as well as other cargo units.